Passion, dedication, innovation, enterprising, integrity, truth-seeking, altruism, win-win
The end of the 5.6-meter-long steel pipe is mechanically cut, and the pipe end is relatively sharp to prevent direct insertion from damaging the pipe sealing ring. The ends of the tube will need to be cut off with a knife or hand grinder to remove the angle at the front and then inserted into the pinch tube.
4. Compression operation
the and set perpendicular to the axis must be tubular members, also the caliper jaws need tubular collars to slot into the compression jaws. For safe operation, the operator can stand on the shaft of the pipe, not on the sides of the clamp.
1. Manual clamping tool, the clamper is two upper and lower fixed modules, the pressure is set to output a constant pressure of 50mpa, and the testing standard is to observe the upper and lower cracks, under one or two pressures.
2. The electric large clamping tool uses a 220 V power supply motor to drive the cylinder to clamp. The connecting oil pipe and quick connector must not be polluted, otherwise the dirt in the oil circuit system will affect the normal use of the tool. Connect the main engine with the hydraulic cylinder, turn on the power first, and then tighten the safety valve until the pressure gauge rises to about 45 MPa, or the main engine jumps automatically, then open the safety valve, turn off the power, and remove the chuck when the voltage is completely discharged.
5. Inspection
It is necessary to check the effect of compression molding after each compression is completed. In this case, severe depression may not occur if the retention tube is not in place or trapped. Visually, the joint between the nozzle and the pipe is dense, and the diameter of the DN25 pipe is 0.1-2MM smaller than that of the diamond side, and the larger outer diameter is larger than the pipe connection to form a larger diameter difference.
6. Cleaning of 316L stainless steel pipe
It is recommended to use 3% potassium permanganate to disinfect the pipeline after installation. It is strictly forbidden to use bleach, etc., and must be cleaned with clean water after disinfection. If it is not put into use in a short period of time, it is necessary to blow out the residual water in the pipeline with compressed air to prevent the corrosion reaction between the free oxygen in the pipeline and other media.
7. Pipeline support installation
The 316L stainless steel pipe can withstand the corrosion environment of 200PPM acid chloride and 2PPM chlorine in aerobic environment. If the bracket is made of carbon structural steel, it is necessary to insulate the pipes to prevent the existence of corrosion potential differences, and the outer wrapping cotton insulation and anti-corrosion treatment. Remember, do not use steel pipe glue and materials containing chloride ions and halogens are corrosive.